612-423-9049

Flood Barrier: Stack-able Fast-Built Levee, Stack-able 18in Fast'-Built Levee Created by the Instee Levee Builder

Flood Barrier: Stack-able 18in Fast-Built Levee Created by the Instee Levee Builder. This five-stack is more than 48 inches tall!

Flood Barrier:  Stack-able Fast-Built Levee

Compare Fast-Built Levees® With Standard Sandbags

Learn more at www.progressiveinnovations.com

Metric

American Standard

 


Compare cost including the sand:

To create a barrier 18in high and 100ft long out of Standard sandbags would require about 1,400 sandbags at $0.35/sandbag, and including cost of sand*, would cost about $858 not including the cost of labor and installation.

With Fast-Built Levees™ a barrier 18in high and 100ft long, including the cost of sand* or clean fill dirt (even cheaper than sand), would cost $284 and with minimal labor and completed in about 15 minutes!

 

The value of 18in high Fast-Built Levees™ is like that of buying filled sandbags* with free shipping to your yard that are stacked tightly already placed where they are needed in a flawless zero seepage barrier for$0.20/sandbag!

That is $2.84 per foot for an 18in high Fast-Built Levee™!

*presuming a price of $16/cubic yard of sand

 


Compare cost per foot* for an 18in high barrier:

Standard sandbags: $8.58/ft not installed

18in high Fast-Built Levee™: $2.84/ft installed!

 


Compare cost around an average 100,000ft 2 per city block

(approximately 316ft x 316ft)* for an 18in high barrier:

 

Standard sandbags: $10,852 per city block not installed (about 17,708 sandbags)

18in high Fast-Built Levee®: $3,592 per city block Installed! And takes about 3hrs 15min with 1 Instee Levee Builder®!

 


Compare cost per mile* for an 18in high barrier:

Standard sandbags: $45,302 per mile not installed (about 73,920 sandbags)

18in high Fast-Built Levee®: $14,995 per mile Installed! And takes about 13hrs 15mins with 1 Instee Levee Builder®!

 


Compare cost excluding the sand:

To create a barrier 18in high and 100ft long out of Standard sandbags would require about 1,400 sandbags at $0.35/sandbag, excluding cost of sand, would cost $490 besides the cost of labor and installation.

With Fast-Built Levee® a barrier 18in high and 100ft long, excluding cost of sand, would cost $100 and with minimal labor and completed in about 15 minutes!

The value of 18in high Fast-Built Levees® is like that of buying empty sandbags for $0.07/sandbag plus the price of sand or clean fill dirt (even cheaper than sand) and it is as if these sandbags place themselves with little effort at about 4,800 bags an hour with a two or three man crew! And in a perfect zero seepage barrier!

*presuming a price of $16/cubic yard of sand
Learn more at www.progressiveinnovations.com

 

Metric

American Standard

sandbag filler ideas

Send